Steel Frame Base
Vertical Divider
In some cases a traditional concrete base just isn't possible. This could be because it is too far for us to pump concrete (80 meters max), narrow access road, the ground is on too much of a slope or a concrete base isn't the best option.
|
Assuming a clear ground area. Prices include concrete piles/stilts, Sub floor under insulation, and floor joists.